background image

11

10

USER’S 

MANUAL

Dearest customer:

Thank you for choosing one 

of our NATERIAL products

BEFORE YOU START YOU SHOULD KNOW…

We advise you to carefully follow this instruction manual step by step for a correct assembly of 

the product.

Make sure you have all the necessary parts for assembly.

Plan to install the product on a dry, windless day. Avoid assembly on adverse weather days to 

avoid product damage or personal injury. The shed is not designed to be built directly on the 

lawn.

Mounting on a level, firm base of wood, a flat cement floor, or cemented brick or block is 

recommended. It is very important to fix the house to the ground. To do this, the box has 

holes in the L1 pieces that facilitate its fixing. It does not include screws or other necessary 

parts for its anchorage.

If a concrete deck is made, it is important to lean toward the edges to prevent water ingress

The product should be located in a place sheltered from the wind and with good drainage. 

Avoid placing it very close to areas with trees, as regular cleaning of branches and leaves that 

require falling will be necessary.

The assembly must be carried out between 2 people at least. Always keep tools on hand 

during assembly.

TOOLS NEEDED:

CLEANING AND MAINTENANCE:

It is recommended for its correct conservation to keep the product clean, its cleaning can be 

done with a soft damp cloth.

Never use abrasive solutions or detergents on the product.

It is important to always keep the house drains clean so that dirt does not accumulate on the roof.

DISCOVER

 OTHER PRODUCTS IN THIS COLLECTION:

IMPORTANT NOTE: 

Wear work gloves, eye protection, pants and a long-sleeved 

shirt for assembly or any maintenance of the product. Several pieces of the 

shed contain sharp edges.

NEW PORT

HUNTINGTON

MALIBÚ

EN

Summary of Contents for MALIBU

Page 1: ...MALIB EAN 8435059720166 MANUAL DE INSTRUCCIONES MANUAL DE INSTRU ES MANUEL D INSTRUCTIONS USER S MANUAL BENUTZERHANDBUCH...

Page 2: ...ETIEN EASY CLEANING AND MAINTENANCE FREE EINFACHE REINIGUNG UND WARTUNG INCLUYE CIERRE DE SEGURIDAD CON LLAVE COMPREND LA FERMETURE DE S CURIT AVEC LA CL INCLUI O ENCERRAMENTO DA SEGURAN A COM CHAVE I...

Page 3: ...e Si se hace una plataforma de concreto es importante que se incline hacia los bordes para evitar la entrada de agua Se debe ubicar el producto en un lugar resguardado del viento y con un buen drenaje...

Page 4: ...cess rias para a fixa o Se for feita em uma plataforma de bet o importante que se incline para as bordas para evitar que a gua entre no abrigo O produto deve estar localizado num local protegido do ve...

Page 5: ...rasse en b ton est fabriqu e il est important de se pencher vers les bords pour viter la p n tration d eau Le produit doit tre plac dans un endroit l abri du vent et avec un bon drainage vitez de le p...

Page 6: ...If a concrete deck is made it is important to lean toward the edges to prevent water ingress The product should be located in a place sheltered from the wind and with good drainage Avoid placing it ve...

Page 7: ...von Wasser zu verhindern Das Produkt sollte an einem windgesch tzten Ort mit guter Drainage aufgestellt werden Stellen Sie es nicht in der N he von B umen auf da regelm ig herunterfallende Zweige und...

Page 8: ...15 14 L1 NEW PORT HUNTINGTON MALIB GR...

Page 9: ...garant as y explicaciones del manual de instrucciones as como los da os causados por exceder la capacidad de carga de almacenamiento del producto 10 A OS GARANT A GARANTIA A gama completa de abrigos...

Page 10: ...assemblages non effectu s conform ment la loi sur les garanties et les explications du manuel d instructions ainsi que les dommages caus s par le d passement de la capacit de stockage du produit 10 A...

Page 11: ...el berschwemmungen usw Die schlechte Montage falsche Verwendung und die daraus resultierenden Konsequenzen Wartungs und Verschlei teile wie Sto d mpfer Zylinder Griff und Scharniere Kunststoffteile Re...

Page 12: ...2 2 3 2 4 2 5 1 6 1 7 1 8 1 20 2 12 2 13 2 14 2 16 4 21 2 1260mm 1660mm 1660mm 722mm 722mm 1750mm 1750mm 1718mm 1788mm 734mm 734mm 1750mm P1 6 1750mm D2 1 1716mm GS 4 L1 8 GB B6 2 1 F3 F1 F2 S3 S2 K3...

Page 13: ...21 21 GS GS GS GS GE GE 13 13 14 14 12 12 19 P7 P7 P7 P7 P9 P9 20 GB D2 B6 B6 16 16 16 16 L1 L1 L1 L1 L1 L1 L1 L1 5 6 7 8 1 1 2 2 4 4 3 3 P1 P1 P1 P1 P1 P1 P3 P3 P3 P3 P3 P3 P9 P9 2 1 3 4 5 6 ASSEMBL...

Page 14: ...3 PART NO Qty 2 2 4 4 P1 F1 12 S3 18 F2 6 4 P3 4 3 P1 4 3 P1 P2 4 P2 3 F2 S3 P1 P1 F1 S3 P1 P1 P3 P3 P1 P1 P3 P3 PASO 1 PANELES LATERALES X2 ETAPA 1 PAIN IS LATERAIS X2 TAPE 1 PANNEAUX LAT RAUX X2 ST...

Page 15: ...all PART NO Qty 2 P3 F1 4 S3 6 F2 2 1 5 1 6 1 7 1 8 5 6 8 P3 P3 8 7 F2 S3 F2 S3 7 P3 P3 8 6 F1 S3 6 7 7 8 5 5 PASO 2 PANEL TRASERO ETAPA 2 PAINEL TRASEIRO TAPE 2 PANNEAU ARRI RE STEP 2 REAR WALL SCHRI...

Page 16: ...ly L1 PART NO Qty 8 F1 16 1 3 3 1 Above below L1 F1 L1 F1 PASO 3 PANEL FRONTAL ETAPA 3 PAINEL FRONTAL TAPE 3 PANNEAU AVANT STEP 3 FRONT WALL SCHRITT 3 FRONTPLATTE BHMA 3 PASO 4 MONTAJE DE LOS PANELES...

Page 17: ...20 20 21 21 F1 F2 F2 20 21 F1 F1 18 14 13 13 14 F1 S3 F1 13 14 S3 16 F1 6 7 8 PASO 5 MONTAJE DE LA FIJACI N DEL TECHO ETAPA 5 MONTAGEM DA FIXA O DO TETO TAPE 5 MONTAGE DU TOIT STEP 5 GABLES SCHRITT 5...

Page 18: ...2 GS 4 GE 2 19 1 14 P9 P7 P7 13 P7 P7 F1 S3 P7 P7 P9 P7 P7 P9 12 12 GS GS F2 F2 8 12 19 GE GE F1 S3 19 GE F1 S3 12 P9 P9 P9 14 13 14 13 PASO 6 MONTAJE DEL TECHO ETAPA 6 MONTAGEM NO TETO TAPE 6 MONTAGE...

Page 19: ...8 INSTALACI N DE LA PUERTA Y CERRADURA ETAPA 8 INSTALA O DA PORTA E DA FECHADURA TAPE 8 INSTALLATION DE LA PORTE ET DE LA SERRURE STEP 8 INSTALLING THE DOOR AND LOCK SCHRITT 8 T R UND SCHLOSSINSTALLA...

Page 20: ...8 7 ENHORABUENA PARAB NS F LICITATIONS CONGRATULATIONS GL CKW NSCHE...

Page 21: ...ono Industrial de Barros 29 39408 Barros Cantabria Espa a CIF B 39856455 34 942 84 21 70 PARA LEROY MERLIN ESPA A S L U Av de la Vega 2 28108 Alcobendas Madrid Espa a BCM BRICOLAGE S A Rua Quinta do P...

Reviews: