1. Remove the jumper (JP1) from the control board. (This activates the power vent function).
2. Replace the control board cover and all wire harness connections
except
for the power cord (x1), it will be replaced with
the new wire harness (provided).
3. Connect the new wire harness in locations (x1) and (x12) as shown on the top of the control board.
4. Cut the yellow wire loop (APS) located in (x5) and connect one end to the orange wire and the other end to the red wire of
the new wire harness. Secure grounds to the base.
5. Connect the other end to the wire harness provided with the GPV.
6. Test your appliance by turning it on using the remote.
There is a 15 second pre-purge before the burner will light and a 120 second post-purge once the appli-
ance is turned off before the blower stops.
note:
X5
X1
X12
W415-4076 / A / 03.08.22