W415-1066 / A / 03.06.12
11
4.0 INSTALLATION
if the crating is too large for maneuvering in the doorways and staircases, remove the crate verticals, diagonals
and top pallet.
• electrical harness (1 pc.)
• bricks (25 pcs.)
• baffles (2 pcs.)
• Secondary Air Tubes (4 pcs.)
• installation and operating manual
• limit Switch and mount bracket (Plenum) (2 pcs.)
• Pleated filter and frame (2 pcs.)
• Painted black cast door and handle (2 pcs.)
THE BAsE pALLET Is sECURED TO THE FURNACE BY ADjUsTINg THE LEgs AT THE BOTTOM OF
THE FURNACE.
THE BAsE pALLET sHOULD NOT BE REMOvED UNTIL THE FURNACE Is pLACED CLOsE TO ITs
FINAL INsTALLATION LOCATION!
LIFTINg OF THE FURNACE sHOULD BE THROUgH THE BAsE pALLET - LIFTINg OF FURNACE BY
METAL BAsE HOUsINg CAN REsULT IN DAMAgE
THE INsTALLATION OF THE FURNACE MUsT BE DONE IN ACCORDANCE wITH RULEs OF AU-
THORITIEs HAvINg jURIsDICTION AND THE CAN / CsA B365-01 (R2006) sTANDARD FOR sOLID
FUEL BURNINg AppLIANCEs AND EqUIpMENT.
CAUTION
mAnoeuvring And PAlleT re-
movAl requireS A minimum of
TWo PeoPle.
CAUTION
high cenTre of grAviTy! ThiS uniT iS very ToP
heAvy! uSe cAuTion When mAnoeuvring or re-
moving The furnAce from The bASe PAlleT.
4.1 CrATEd uNIT CONTAINS
4.2 rECOmmENdEd STEP
lifTing PoinTS
lifTing PoinTS