![NADDOD S3600 Series Installation Manual Download Page 24](http://html1.mh-extra.com/html/naddod/s3600-series/s3600-series_installation-manual_4528368024.webp)
S3600 Series Installation Guide
Initial Startup after Power on of Switches
NADDOD Pte. Ltd.
14
3
Initial Startup after Power on of
Switches
3.1 Building Configuration Environment and Connecting
Cables
Figure 3-1 Building Local Configuration Environment
via Console Port
Step 1
Connect the DB-9 hole plug of the provided cable to the serial port of a PC via which switch
configuration will be made.
Step 2
Connect the RJ-45 end of the provided cable to the console port of the switch.
CAUTION
Please use the attached DB-9 to RJ-45 cable to avoid incompatibility.