
1-4
Scope
Magnum 4A Control Wiring and Adjustment Manual
Part #C-00084
Rev. 9-09-16
CHAPTER 1: Scope
Section 1a. To the Installer
The purpose of this manual is to familiarize the installer with the proper installation and operation of this
system. It is essential that this equipment be properly installed and operational before the door is used
by the public. It is the installer’s responsibility to inspect the operation of the entrance system to be sure
it complies with any applicable standards. In the United States, ANSI Standard 156.10 (Used to cover Full
Energy doors) and ANSI Standard 156.19 (Used to cover Low Energy doors) apply. Other local standards
or codes may apply. Use them in addition to the ANSI standards.
The owner should determine the door is operating properly and should immediately call for service if
there is any malfunction. All installation changes and adjustments must be made by qualified, NABCO
trained technicians.
Section 1b. Objective
The Opus Control is designed to be installed within the Header of:
X
New or Existing Swing Door systems.
X
New or Existing Fold Door systems
X
Existing Slide Door systems to replace Magnum Controls, Analog Controls, and U-01 to U-19 Controls.
Sold as a Retrofit Kit only. Retrofit kits can be purchased by contacting Customer Service at 1-888-
679-3319.
This manual offers step by step instructions.