
Connect Incoming 120 VAC Wires
5-15
Rev. 9-09-16
Part #C-00084
Magnum 4A Control Wiring and Adjustment Manual
CHAPTER 5: Connect Incoming 120 VAC Wires
Disconnect 120 VAC power prior to making any electrical connections. Failure to
do so may result in serious personal or fatal injury. When uncertain whether power
supply is disconnected, always verify using a voltmeter.
Notice: Wiring must meet all local, state, federal or other governing agency codes.
1.►
Ensure all power is disconnected.
2.►
All high voltage electrical connections must be made by licensed electricians.
3.►Insert all Incoming 120 VAC, single phase, 5 amp (minimum per Operator) power wires into the pre
drilled Electric Service Access Hole located at the left or right side of Header End Cap.
a.
It is recommended for the Installer to house all Incoming 120 VAC wires within an Electrical
Conduit.
Keep all Incoming 120 VAC wiring separate from low voltage wiring within Header.
4.►Obtain (self sticking) white plastic Wire Clips that were provided within Header.
5.►Pull off backing of each Wire Clip to expose adhesive. Adhere each Wire Clip to sides of Header.
6.►Insert wiring into Wire Clips (as deemed necessary).
a.
120 VAC Power wires must be routed (separate from other wiring) within plastic Wire Clips
located near the top of inside Header.
Note: For more wiring details, please refer to “Associated Manuals Part Numbers”; Section 2d.
Note: If 120 VAC Power wires must be installed from Hinge Side of Header, ensure that wires are securely
clipped, to prevent pinching of the wires during the Motor/Operator installation process.
DANGER
CAUTION