8 of 38
GT 300-350-8300-8350 Opus Overhead Concealed Swing Door Installation Manual
www.NabcoEntrances.com
P/N C-00175
Rev 5-23-18
3. Go to the bottom, Strike side of Header.
4. Insert the Panic Latch wires and spring coil into the opening until the Panic Latch butts up against the Header.
a. For wiring instructions please refer to P/N C-00139 Opus Wiring and Programming Manual.
DN 0487
Insert Wires and Spring Coil
Figure 4 Insert Wires and Spring Coil thru Opening of Strike Plate
5. Secure the Panic Latch from inside the Header with (2) Socket Head Cap Screws and (2) Washers.
a. Do Not wire or test the Panic Latch at this time.
SECTION 5 .3: Install the Door Stop
A Door Stop is used to stop the door from swinging farther back from the fully closed position.
1. Obtain the Door Stop.
2. Remove (4) Socket Head Cap Screws and (4) Washers. Set aside.
3. Go to the bottom, Pivot side of Header. Butt the Door Stop against the underside of the 3-1/4 inch Strike Base.
X
For an Outswing, the Stop end of Door Stop must face front side of Header.
X
For an Inswing, the Stop end of Door Stop must face back side of Header.
4. Secure Door Stop from inside Header with (2) Socket Head Cap Screws and (2) Washers.
DN 0465
Screws
Door Stop
(Outswing Confi gura on)
Washers
Door Stop
(Inswing Confi gura on)
Strike Side
(of Header)
Figure 5 Install the Door Stop
SECTION 5 .4: Prep the Jamb Tubes
1. Measure the full height of existing Swing door.
2. Obtain (1) Jamb Drilling Template provided by NABCO.
3. Place the Jamb Drilling Template at the top of Jamb Tube so it is flush. Align the center to the previously drawn center mark.
4. Adhere the Jamb Drilling Template to each Jamb Tube. The Jamb Drilling Template is removable.
Figure 6 Adhere Jamb Drilling Template
DN 0469
Line marking
Center of Jamb Tube
Jamb Drilling Template
5. Drill (4) .391 diameter holes through (4) clearly marked (A)s on the Template. Countersink each screw hole.