background image

 

 

 

 

NB-205QM/205QMC(Ver. 1)                                                                                                    12/17 

4. INSTALLATION   

 

Unpacking 

Packing for this item is done with hard cartons and pallet. Use proper tools like carts or trolley. 
When received the carton of this product, carefully examine for any shipping damage before unpacking.   

 

Open the carton carefully and check all the parts of incubators are fine. If damage is found, promptly report it 
to the carrier and request a damage inspection properly. 

 

Unpack the incubator from its wrapping and take the sponge which fixing shaker out. 
After unpacking, verify all packaged items are properly in incubator. 

1. Operation Manual 
2. Power Cable 
3. Stacking Kit (Hidden in top of incubator: Check this out only when stacking is necessary) 

If any items are missing, contact provider and report the missing. 

 

4.1. Installation   

Single use (no stacking) 

Place the incubator on the floor or table near an electrical outlet and make enough space(at least 5cm) around 
incubator for free air convection, accessory attachment and user convenience

.   

 

Stacking use 

Place the incubator on flat floor and ensure enough space around incubator to lift incubator by two people. 
Make sure that base incubator is level and placed at bottom securely. Open top cover of base incubator and 
find  the  stacking  kits.  Referring  some  procedures  and  photos  in  page.  8,  fix  the  cover  to  support  upper 
incubator  securely  and  install  stacking  kit  as  described  in  page  8.  Use  the  grip  at  both  sides  and  lift  one 
incubator to be mounted on incubator at floor. When locking the grip into stacking kit, watch injury on hand. 
Press down one side of upper incubator to lock the grip into stacking kit more easily.     

 

Electrical Requirement 

Check the serial label near power receptacle and confirm the voltage, hertz, and the model number.   
Ensure that the power cord cable is not damaged and use the cord fit to outlet in lab. 

 

Shaker Installation 

Shaker is basically placed on the bottom of chamber. Just ensure that it is placed at its place properly. 4 of 
shaker rubber feet are mounted on 4 hexagon bolts which are fixed on bottom of chamber. If any shaker is 
out of its base bolts, correct it to be placed securely. Move the platform by hand to be sure that shaker rotate 
smoothly and shaker is mounted on its place well. Visually check that shaker connector is properly connected 
into its outlet at right back and bottom of chamber. Refer to photos of shaker connector show in the section 
3.4 in page. 9. Ensure the platform is horizontally level. 

     
 

Summary of Contents for NB-205QM

Page 1: ...www n biotek com N BIOTEK NB 205QM QMC Ver 205QMQMC001 1 17 Stackable Incubator Shaker NB 205QM QMC Version 1 OPERATING MANUAL...

Page 2: ...1 3 Precaution for use 5 2 FEATURE SPECIFICATION 2 1 Features 6 2 2 Specification 6 3 CONFIGURATION CONTROL PANEL 3 1 Configuration 7 3 2 Stacking 8 3 3 Reversible Shaking Motion Platform Optional 9...

Page 3: ...the faulty caused by user s improper operation excessive use use of incorrect voltage frequency storage in wrong environment mentioned in manual 4 Complete the above table after installation and keep...

Page 4: ...essed by heavy products When it is damaged it can cause electric leakage or fire Do not handle the power cord with wet hands It can cause an electric shock Do not use the damaged power cord and outlet...

Page 5: ...incubator To prevent water and experiment material from going into the control panel during the experiment make sure to clean the control panel with a dry towel It can cause a fire and an explosion D...

Page 6: ...D 4W LED Operating Temperature 5 C 35 C 5 C 35 C Display Digital Display 5 Digit LED Digital Display 5 Digit LED Shaker One Mini Shaker Built in One Mini Shaker Built in Shaking Motion Orbital Orbital...

Page 7: ...Thermal Cut Off Power Cord Receptacle with Fuse Holder Glass Window Control Panel Screw Tap for Hinge of door for reversible door Shaker Photo 1 Front View Connector of Shaker Vent Holes To cool down...

Page 8: ...above cover you can find two kits with its screw tighten Install the stacking kit like Photo 4 Turn top cover over and fit it into the frame at top of incubator Photo 5 Locked with Stacking Kit Photo...

Page 9: ...e Shaking Motion Platform Optional Photo 6 Reciprocating Motion Type Photo 7 Orbital Motion Type 3 4 Shaker Connector Photo 8 Connector Socket of Shaker At Right and Back of Internal Chamber Photo 9 F...

Page 10: ...MP ON OFF Internal LED Lamp ON OFF Button MUTE Alarm Mute Button SET TEMP Temperature Set up Button Button for Increasing Value in Temperature Setting Mode Button for Decreasing Value in Temperature S...

Page 11: ...Lamp ON OFF Button MUTE Alarm Mute Button COOL Indication for Peltier Cooling SET TEMP Temperature Set up Button Button for Increasing Value in Temperature Setting Mode Button for Decreasing Value in...

Page 12: ...t base incubator is level and placed at bottom securely Open top cover of base incubator and find the stacking kits Referring some procedures and photos in page 8 fix the cover to support upper incuba...

Page 13: ...5 4 6 500ml full 300 3 05 200ml 300 1000 2 3 4 3 85 1000ml full 300 5 15 1000ml full 295 6 5 1000ml full 260 1000 2 3 4 3 10 600ml 300 4 60 600ml 285 4 95 600ml 250 2000 1 3 4 2000ml full 300 2000 1 2...

Page 14: ...u do not need timer and do need the control for shaking just by On Off switch leave the time set at t 00 00 4 To set the desired mixing speed when shaker stop Press RPM TIME key to switch RPM display...

Page 15: ...m will automatically stop If mute key is pressed during the shaker alarm 10 minutes of alarm delay will be given If there is door open during RPM alarm shaker will stop and alarm system will be inacti...

Page 16: ...through this delay program Over Temperature Cut Off visual warning only Thermal cut off have sensor attached on exterior surface of chamber seperately from main temperature sensor This protects over h...

Page 17: ...f chamber Then lift the shaker up vertically grabbing shaker body and take it out carefully from the chamber Clean the chamber with soft cloths and 70 alcohol After that dry the chamber completely bef...

Reviews: