NB-205QM/205QMC(Ver. 1) 13/17
Platform Installation
At each corner of base platform, there are four thumb screws supporters to mount universal platform or
spring rack platform. One spring rack platform is basically mounted on the base platform. If other dedicated
platform or tube rack platform is needed to use, just take spring rack out and fit the desired platform in four
supporters, thumb screws.
Do not operate shaker with an unbalanced load. Platforms should be loaded for optimum
stability and operation. Do not lift up platform when lifting up shaker to take out from chamber.
Note: Sample Loading Capacity on Shaker
RPM capacity with some flask platform is as following:
Flask Platform
Total Weight(sample volume)
Reachable Max RPM
250 * 9
4.65(250ml full)
300
4.20(200ml)
300
500 * 5
4.6(500ml full)
300
3.05(200ml)
300
1000 * 2
* 3
* 4
3.85(1000ml full)
300
5.15(1000ml full)
295
6.5(1000ml full)
260
1000 * 2
* 3
* 4
3.10(600ml)
300
4.60(600ml)
285
4.95(600ml)
250
2000 * 1
3.4(2000ml full)
300
2000 * 1
2.6(1400ml)
300
Do not operate the shaker at speeds that will cause the contents of vessels to be thrown out.
Reversible Door Installation
Door is installed to open basically from right to left. If it is needed to reverse the door open position, unscrew
2 screws of door hinge that are fixed in main body. Leave other two screws in hinge which fixing door.
Remove four plastic screws which are filled in the screw taps at right side(at front view) of incubator, fix the
door hinge with securing screws in its screw taps.
Drain hose Installation (NB-205QMC only)
For NB-205QMC, find the drain hose at back of incubator. Place it in proper place avoiding area of electric
part. Place the tray at end of tube to collect water from chamber. Regularly check the collecting tray not to
overflow.