background image

1.0

General Information

03

2.0

Heating System Design

03

3.0

Unit Selection/Sizing

03

4.0

Location

03

5.0

Preparation

04

6.0

Fixing

04

7.0

Water Connections

05

8.0

Electrical Connection

06

9.0

Commissioning Procedure

07

10.0

Technical Data

08

11.0

Operating Instructions

09

12.0

Troubleshooting

10

13.0

Maintenance

11

Contents

23674 HiLine Super RC manual  27/06/2011  09:24  Page 3

Summary of Contents for 25-18

Page 1: ...erating Maintenance and After Sales Manual Product Serial Number Please leave this manual with the end user Part Number 1370065 Issue 4 heatingthroughinnovation HI LINE Super RC Models 25 18 29 20 01...

Page 2: ...t Selection Sizing 03 4 0 Location 03 5 0 Preparation 04 6 0 Fixing 04 7 0 Water Connections 05 8 0 Electrical Connection 06 9 0 Commissioning Procedure 07 10 0 Technical Data 08 11 0 Operating Instru...

Page 3: ...appliance This fan convector must be fitted on a two pipe pumped circulation heating system For optimum fan convector heating performance the system must be capable of providing sufficient hot water t...

Page 4: ...lace on screws with adhesive side towards the point l Tighten the screws into the wall leaving about 9mm projecting l Press adhesive washers to the wall Remove the outer casing as follows l Remove the...

Page 5: ...st practice and a suitable inhibitor is added to the system as necessary l Open valves fully check pipe connections for leaks and vent the heat exchanger see Commissioning Procedure Fig 4 Fig 3 5 0 6...

Page 6: ...e unit should be made through the hole provided at the top left hand side of the unit using the cable gland provided l Connect live and neutral wires to the power board terminal connections and the ea...

Page 7: ...is means low outlet air temperatures from the unit are avoided when the room temperature is low in relation to the set temperature This facility can be switched on or off by following the instructions...

Page 8: ...orrection Factors 455 ltr h 100 gal h multiply by 1 03 227 ltr h 50 gal h multiply by 0 98 113 ltr h 25 gal h multiply by 0 85 Model Air Flow m3 h Air Flow ft3 h 29 20 390 470 540 13772 16597 19069 25...

Page 9: ...n manual mode with water temperature control any of the 3 fan speeds can be selected and the fan will operate when the water temperature in the coil is greater than 32 C This means that heating perfor...

Page 10: ...seconds until the horizontal bars disappear 10 HI LINE Super RC 12 0 Troubleshooting Once installed this fan convector becomes part of a complete heating system that generally will include boiler pum...

Page 11: ...crease temperature set point Switch on at spur Replace fuse Open valves Check boiler Programmer ON Boiler ON and set to high with central heating pump running Note Operation of fan convector can be ch...

Page 12: ...482 713927 F 01482 789056 service convectors myson co uk Spare parts and technical help on all Convector products are available from MYSON Service MYSON Eastern Avenue Team Valley Gateshead Tyne Wear...

Reviews: