
Application Examples
Key for Wiring Diagram 14
eddi
device
Mains supply (230V AC from B16 circuit breaker or
13A fused spur)
Hot water cylinder
Water heating element (max. 3.7kW)
Isolator (20A double pole)
Relay & Sensor Board (optional add-on for
eddi
)
Temperature probe (type PT1000) (optional)
Swimming pool
In-line electric pool heater (max. 3.7kW)
Pool heater thermostat (16A rated)
Pool circulation pump
Pool circulation pump fused spur
Functional Description
In properties that benefit from a swimming pool,
eddi
can be use to maximise self-consumption of surplus power, by first
heating the domestic water before switching to divert the surplus power to contribute to pool heating.
Heater 1 (the immersion heater in the hot water cylinder) (4) is heated with surplus power until the domestic water is hot
and the thermostat opens, then
eddi
will immediately switch over to Heater 2 to heat the pool (8) with surplus power.
During heating of the pool (Heater 2),
eddi
will briefly switch back to the domestic water heater (Heater 1) every 15 mins to
check if it can store any more heat.
When Heater 2 is active (i.e.
eddi
is heating the pool), Relay 1 of the Relay & Sensor Board (6) will be on and so the pool
circulation pump (11) will run thus transferring heat from the pool heater (9) to the swimming pool.
Installation of the temperature probes (7) is optional; the heaters' mechanical thermostats are used by
eddi
if temperature
readings are not required.
Settings Required
Menu Option
Settings
Main Menu
Settings…
Display…
Icons…
Heater 1:
Top Immersion /
Bottom Immersion
Heater 2:
Pool
Priority…
Heater 1
Advanced Menu…
Relays &
Sensors…
Temperatures…
Set Temperatures as
required if using
temperature probes
Relay 1…
Heating…
Heater 1
operation and installation manual
eddi
59
1
2
3
4
5
6
7
8
9
10
11
12