![MUTRADE Hydro-Park 1123 User Manual Download Page 29](http://html.mh-extra.com/html/mutrade/hydro-park-1123/hydro-park-1123_user-manual_1860238029.webp)
Hydro-Park 1127 & 1123
USER MANUAL
27
MUTRADE INDUSTRIAL CORP.
4.5.39
Fasten all the bolts except anchor bolts if no problem is found after 5 times of up and down movements.
Check rotation of chain wheels, tension of chains and smoothness of platform moving.
4.5.40
Fasten all the anchor bolts if no problem is found after another 5 times of up and down movements.
4.5.42
Lubricate every sliding part with the lubricant after installation.
ATTENTION: during all operation, please check carefully on all moving parts to make sure they are assembled
correctly and work well. Fix any problem before installation finishes.
4.5.41
Fix the cylinder head cover
onto cylinder head.
(53) All anchor bolts
(54) Cylinder head cover