![MUTRADE Hydro-Park 1123 User Manual Download Page 17](http://html.mh-extra.com/html/mutrade/hydro-park-1123/hydro-park-1123_user-manual_1860238017.webp)
Hydro-Park 1127 & 1123
USER MANUAL
15
MUTRADE INDUSTRIAL CORP.
4.5.13
To fix the anchor bolts, drill holes on the ground by electric drill with drill diameter 12mm at the positions of
anchor bolt holes on the base of post. Then hammer the anchor bolts vertically into ground with approx. 130mm
deep. Do not fasten the nuts at the moment, it’s possible to slightly adjust the post during testing.
4.5.15
Fix front support onto primary
post and subsidiary post by bolts.
4.5.14
Erect the subsidiary post at
specified position according to lines drawn
on the slab. Slide the carriage to the height
of lowest locking hole to make the carriage
is locked automatically at the lowest
locking position.
(25) Front support
(24) Subsidiary post and right carriage