3
FA6 Installation planning
– Connection of cold-water, drain and power
4
Simple to install
4
Placement in unit space
4
Water connection
5
Circulating-water system
5
Direct-water system
5
Pressure requirements at water supply connection point
5
Air filter
5
Water discharge
5
Calculation of the size of the water trap required
5
Technical specifications
6
Electrical data – circulation pump
6
Electrical – solenoid valve for step control
6
Drain capacity
6
Sound attenuation
6
Maximum continuous operating temperature
6
IP classes
6
Electrical connections
7
Electrical connection for the pump motor
7
Electrical connection for the solenoid valve
7
Motorized drain valve
7
Programming off BMS/control system
8
Safety responsibility
8
Improper use of equipment
8
Disposal of used humidifier cassettes
8
Dimensions, weights and pump sizes
9
Installation
10
Delivery conditions and storage
10
Inspection
10
Transport and lifting
10
When delivered assembled
10
When delivered as components
11
Assembly instruction drain system FA6
12
Start-up
13
Inspection before startup
13
First start up/ Rinsing clean the humidifier
13
Adjustment of bleed-off flow
13
Service
13
Periodic maintenance
13
Annual service
13
Annual inspection
13
Cleaning distribution holes
13
Cleaning the reservoir and pump filter
14
Disassembly of cassettes and droplet separators
15
Restart after service
15
Fault-finding
Fault-finding table
16
Spare parts
17
Ordering spare parts
17
Parts list
17
Spare-parts list
18
Item number for humidifier modules
19
Item number for droplet separator
19
Contents