17
Issue 13 (11/14/2017)
4.7
Care and Maintenance of Batteries
Once installed and connected batteries must not be allowed to sit idle without receiving a charge. The power
supply must be started, even if at minimum load, and allowed to charge the batteries. Initial charging to ensure
full reserve time may require as long as seven days to accomplish. Batteries connected to an idle system without
receiving a charge can be irreparably damaged, thereby requiring replacement before the system can be fully
commissioned into service.
NOTE:
The charging requirement becomes a special consideration when the accessory Battery Balance
Manager is integrated into the cabinet installation. The Battery Balance Manager may be connected
only
when
the power supply is fully operational and capable of charging the battery.
Section 5:
Startup
and
Operation
5.1
Startup
The power supply is ready to be placed into operation after it has been installed in its enclosure and all input and
output connections have been made. Ensure that AC input power is available to the power supply receptacle then
perform the following steps in sequence.
CAUTION
The following steps in the startup procedure MUST be performed exactly as
presented; otherwise, permanent damage to the power supply may result.
Observe the LED indicators and the LCD display as a guide in performing
the startup procedure.
1. Ensure that the BATTERY CIRCUIT breaker has been operated to the OFF (O) position. All
connections and initial wiring must be in place as previously outlined and described. Plug the power
supply into the AC receptacle.
2. Operate the utility AC circuit breaker serving the power supply to the ON position. The LCD display
should illuminate, and be indicating that the power supply is initializing.
CAUTION
Do not start the power supply without a minimum load connected. Once
started, do not disconnect the load from the power supply while it is
operating. An unloaded output can result in an unstable operating
condition that will permanently damage your power supply.
3. The LED indicators on the front panel of the power supply should be illuminated as follows upon
startup from the AC utility line:
OUTPUT STATUS:
Green
OUTPUT CURRENT:
Green (without overload)
INPUT STATUS:
Green
BATTERY STATUS:
Off (with BATTERY CIRCUIT breaker off)
CHARGER STATUS:
Off
COMM STATUS:
Off (without communications link); Green (with communications link
established)
Summary of Contents for EB1s
Page 2: ......
Page 35: ...33 Issue 13 11 14 2017 Fig 8 1 Battery Balancer wiring 36V 3 batteries 1 string ...
Page 36: ...34 Issue 13 11 14 2017 Fig 8 2 Battery Balancer wiring 48V 4 batteries 1 string ...
Page 37: ...35 Issue 13 11 14 2017 Fig 8 3 Battery Balancer wiring 36V 6 batteries 2 strings ...
Page 38: ...36 Issue 13 11 14 2017 Fig 8 4 Battery Balancer wiring 48V 8 batteries 2 strings ...