Installation
Ultima Hooklift
01/2020
13
3.3 Sub frame dimensions S & Z
The values in the next table are calculated with both side Z-beams and standard amount of
cross members when the beams are working together. If the value is needed only for one
beam, then the value can be halved.
The sub frame profile
material EN10149:
ULT14-16-18: S500MC
ULT21-26-30: S355MC
Hooklift type
A (in)
B (in)
C (in)
D (in)
E (in)
R (in)
ULT14S
ULT16S46-56
5.71
1.85
4.45
4.21
0.2
0.2
ULT16S55, 59-61
ULT18S/Z
5.71
1.89
4.45
4.21
0.24
0.24
ULT21S/Z
ULT24S, ULT26Z
6.5
1.93
4.76
4.21
0.31
0.31
ULT26S
ULT30S
6.5
1.93
4.76
4.21
0.31
0.31
Hooklift type
A
sub frame
(in
2
)
W
x
top flange
(in
3
)
e
top flange
(in)
W
x
bottom fl.
(in
3
)
e
bottom fl.
(in)
I
x
(in
4
)
ULT14S
ULT16S46-56
5.9226
12.5773
2.64
10.1166
-3.07
32.0071
ULT16S55, 59-61
ULT18S/Z
7.3331
14.6526
2.64
12.2196
-3.07
38.0368
ULT21S/Z
ULT24S, ULT26Z
9.7588
22.4813
2.87
14.8327
-3.62
64.6000
ULT26S
ULT30S
10.6144
26.1114
3.31
21.5104
-3.98
85.9036
Summary of Contents for ULTIMA S
Page 2: ...Installation Ultima Hooklift 01 2020 2 ...
Page 35: ...Installation Ultima Hooklift 01 2020 35 Oil tank dimension steel tanks ...
Page 36: ...Installation Ultima Hooklift 01 2020 36 Oil tank dimension aluminium tanks ...
Page 56: ...Installation Ultima Hooklift 01 2020 56 Camera view examples High Bogey Rear ...