
Preparatory steps – Vertical air intake
1.
Drain engine coolant (→ Page 236).
2.
Remove air filter (→ Page 215).
3.
Seal all openings with suitable covers.
4.
Remove charge-air pipework (1) from ex-
haust turbocharger to intercooler.
5.
Remove oil lines (2).
6.
Loosen clamp (1).
7.
Remove intake housing (3) with actuating
cylinder (2).
MS150068/01E 2014-01
| Task Description | 209
TIM-ID: 0000018629 - 006
Summary of Contents for 12 V 4000 M23F
Page 3: ...Commissioning Note ...
Page 4: ......