6.4 Valve Drive
6.4.1 Valve projection – Measurement
Preconditions
☑
Engine is stopped and starting disabled.
Special tools, Material, Spare parts
Designation / Use
Part No.
Qty.
Sliding depth gauge, 200 mm
Y20000918
1
Preparatory steps
1.
Remove spark plugs (→ Page 134).
2.
Remove cylinder head covers (→ Page 148).
3.
Remove sleeves (arrow).
4.
Install barring device (→ Page 129).
5.
Rotate crankshaft with barring device in en-
gine direction of rotation until marking
“OT” and pointer are aligned.
142 | Task Description | MS150114/01E 2015-03
TIM-ID: 0000043220 - 002