Version 0.1
34
Batteryless telephone system with public address mode BLTS-1006
2) perform a control communication session (using
telephone receiver and external communication de-
vice), test connection of communication lines,
transmission of voice communication and quality
(speech legibility); during communication make
sure that PTT switches of communication devices
operate correctly (no malfunctions or noise)
2 persons
1 hour
3) for portable telephone PH2-5C-PO, additionally
control condition of connector and matching sock-
ets; test every socket, connect it and set a communi-
cation with users; test a connector for headset
2 persons
1 hour
Table 11 – Checklist №4. Check of scope of delivery, SPTA kit condition and operation
documentation
To be done
Routine
Man-hours
per 1 SC
Check of scope of de-
livery, SPTA kit con-
dition and operation
documentation
1) compare SPTA kit items to operational documenta-
tion represented in section 4 «The scope of delivery» of
the System Certificate;
2) check the quality of every SPTA kit item, storage
time; SPTA kit shall be fully recompleted in case of its
use (according to 4.4);
3) recomplete SPTA kit
1 person
1 hour
4.4
Instructions on SPTA kit
SPTA kit is delivered together with the System and used to support operating con-
dition of the System by replacing faulty SC.
Portable SPTA kit shall contain items listed in SPTA kit list.
4.5
Preservation
The System, SPTA kit and set of operational documents are stored in preserved
condition in Manufacturer’s packaging boxes. Time of second preservation – 2 years from
the date of System handling over on the Manufacturer’s plant.
The preservation is done in full terms, for 2 years, applying protection and
packaging.
Represervation may be carried by the Buyer or ship crew if necessary.
The second preservation (represervation) is done in heated rooms in the same or-
der as the preservation.
The represerved System, SPTA kit and set of operational documents are placed in
package. The package is sealed.
The storage time for the represerved System – 2 years.