6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
165
4349322/01 EN
VACUTAP
®
VV
®
6.3.2.2 Bleeding suction pipe on pipe connection S
1. Remove screw cap from pipe connection S.
Figure 172: Pipe connection S
2. Open vent screw and bleed piping.
3. Close vent screw.
4. Seal vent screw with screw cap.
6.3.3 Checking motor-drive unit
NOTICE
Damage to the on-load tap-changer / de-energized tap-changer!
Damage to the on-load tap-changer / de-energized tap-changer due to actu-
ation of the on-load tap-changer / de-energized tap-changer without insulat-
ing fluid.
► Ensure that the selector / de-energized tap changer is fully immersed in
insulating fluid and that the oil compartment of the on-load tap-changer is
completely filled with insulating fluid.
Summary of Contents for VACUTAP VV
Page 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Page 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Page 188: ......
Page 195: ......
Page 197: ......