
7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
56
4360571/02 EN
VACUTAP
®
VM
®
4. Position the on-load tap-changer head cover on the on-load tap-changer
head in such a way that the red triangular markings on the on-load tap-
changer head and the on-load tap-changer head cover are aligned.
Figure 29: Triangular markings and o-ring
5. Screw the on-load tap-changer head cover onto the on-load tap-changer
head.
Figure 30: On-load tap-changer head cover
6. Fill the oil conservator with fresh insulating fluid.
7. Vent the on-load tap-changer head via air-vent valve E1 on the on-load
tap-changer head cover. To do this, remove screw cap and lift valve tap-
pet with a screwdriver.
8. Seal air-vent valve E1 with screw cap (tightening torque 10 Nm).
Summary of Contents for VACUTAP VM I 1002
Page 1: ...On load tap changer VACUTAP VM Operating Instructions 4360571 02 EN Selector size RC RD RDE ...
Page 69: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 69 4360571 02 EN VACUTAP VM 9 Drawings ...
Page 70: ......
Page 71: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......