
7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
49
4360571/02 EN
VACUTAP
®
VM
®
7.2 Maintenance intervals
Maintenance intervals without MR monitoring system
WARNING
Danger of explosion!
If pending maintenance work is not carried out immediately, this may lead to
death or serious injury as a result of a progressive short circuit, for example.
► Adherence to the following maintenance intervals is mandatory.
If you are operating the on-load tap-changer without an MR monitoring sys-
tem, the following maintenance intervals shall apply.
Interval
Action
after 300,000 switching operations (mo-
tor-drive unit counter reading)
Maintenance of the on-load tap-changer.
Contact the Maschinenfabrik Rein-
hausen GmbH Technical Service [
after 1.2 million switching operations
(motor-drive unit counter reading)
Selector maintenance. Contact the
Maschinenfabrik Reinhausen GmbH
Technical Service [
for this.
after 1.2 million switching operations
(motor-drive unit counter reading)
Replacement of diverter switch insert.
Contact the Maschinenfabrik Rein-
hausen GmbH Technical Service [
Table 6: Maintenance plan without MR monitoring system
Summary of Contents for VACUTAP VM I 1002
Page 1: ...On load tap changer VACUTAP VM Operating Instructions 4360571 02 EN Selector size RC RD RDE ...
Page 69: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 69 4360571 02 EN VACUTAP VM 9 Drawings ...
Page 70: ......
Page 71: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......