
7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
54
4360571/02 EN
VACUTAP
®
VM
®
4. Once the gas has been discharged and insulating fluid is flowing out of
the air-vent valve, close the air-vent valve.
5. Close the stop-cock between the oil conservator and on-load tap-changer.
6. Open air-vent valve E1 again and extract approximately 5–10 liters of in-
sulating fluid via the pipe connection S until the area under the on-load
tap-changer head cover is free of insulating fluid.
7. Remove the screws and washers from the on-load tap-changer head
cover.
Figure 26: On-load tap-changer head cover
8. Remove on-load tap-changer head cover.
Figure 27: On-load tap-changer head cover
9. Extract insulating fluid via pipe connection S.
10. Open the stop-cock between oil conservator and on-load tap-changer.
ð
The insulating fluid flows out of the oil conservator into the oil com-
partment.
11. Extract insulating fluid via pipe connection S.
Summary of Contents for VACUTAP VM I 1002
Page 1: ...On load tap changer VACUTAP VM Operating Instructions 4360571 02 EN Selector size RC RD RDE ...
Page 69: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 69 4360571 02 EN VACUTAP VM 9 Drawings ...
Page 70: ......
Page 71: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......