5 Installation and commissioning
45
BA5831400-00 EN
5.4.3 Opening the cover plate
The individual connection cables in the device are connected as shown in
the diagram, which is printed on the inside of the cover plate.
►
Open the cover plate.
Figure 23: Opening the cover plate
5.4.4 Preparing the cables
To prepare the cables correctly, proceed as follows:
1. Note the cable recommendation.
2. Route the connection cable without tension and attach it so that neither
the device nor the cable gland is subjected to mechanical stress.
3. Remove approx. 160 mm (6.3") of the jacket from the cable of the respec-
tive connection lines, strip approx. 6 mm (0.24") of the insulation from the
wires and seal with ferrules.
Summary of Contents for MESSKO MT-ST Compact
Page 25: ...3 Product description 25 BA5831400 00 EN 3 6 Nameplate Figure 9 Nameplate ...
Page 78: ...8 Disposal 78 BA5831400 00 EN Observe the national disposal regulations in the country of use ...
Page 90: ...10 Appendix 90 BA5831400 00 EN NPT adapters optional Figure 73 NPT adapters 1 2 NPT 3 4 NPT ...
Page 91: ......