INSTALLATION STEPS
STEP 2.
Confirm proper stud spacing: The studs must have
a minimum spacing of 14-1/16” and a maximum spacing
19". If the stud spacing is outside the required range then
shim or otherwise reposition the studs as required.
Installing the steam head between incorrectly
spaced studs may result in damage to the steam head and
result in a leak within the wall cavity and cause property
damage.
STEP 3.
Determine the location of the finished wall
surface. Mount the steam head between two studs using
the horizontal slotted holes to position the steam outlet
face to be flush or recess 1/8” from the finished wall
surface (see fig. 4)
Failure to position the steam head face to be
flush or extended 1/8” from the finished wall surface may result
in a leak within the wall cavity and cause problems associated
with leaks, moisture and property damage from leaks.
STEP 4.
Use a level to ensure the steam head is level
(see Fig. 3 ) and the steam head face is flush or recessed
1/8” from the finished wall surface. Install the four screws in
the vertical slotted mounting holes to secure the steam
head to the studs.
STEP 5.
Plumb rigid copper tubing or brass pipe from the
steam generator to the steam head. Plumbing must not
form traps or valleys. Thread sealant must be used as
required to ensure a leak free joint.
4
Linear Steam Head
®
®
NOTE:
Drawings are for illustrative purposes only.
Consult with qualified designer, architect or contractor for steam room construction.
Installation Section
14"-1/
8 ~ 19"
Stud
Stud
Level
Copper
Tubing or
Brass Pipe
(Not
Provided)
Threaded
Adaptor or
Thread Plug
as required
(Not
Provided)
Steam
Outlet
Steam
Outlet
14
1/16”
– 19”
Model 104480
Figure 3