PAGE 22 — MP1 SERIES MASONRY SAW • OPERATION AND PARTS MANUAL — REV. #2 (10/12/17)
SET-UP
ASSEMBLY (GASOLINE POWERED SAWS ONLY)
1. Remove the MP1 saw from its container and place it
on a suitable table or platform. Make sure the table
or platform can support the weight of the saw. The
saw platform should be rigid and stationary so that it
will not move, sag, or sway due to the vibrations and
movements of the saw.
2. If using the MP1 series
support stand kit
(P/N
TRAK14SS), attach stand to the under-side of the
water tray. Follow the instructions supplied with the
support stand kit when attaching it to the water tray.
3. The
gasoline powered
saw uses a
mechanical water
pump. This pump operates by drawing power from the
drive V-belts, and has been adjusted and locked for
wet cutting operation when shipped from the factory.
4. Fill the water tray with clean fresh water. The
water
pump intake (strainer) must always be fully covered
by water to operate effectively
. Also, keep the pump
intake free of sludge, debris and other materials that
may accumulate in the tray.
5. Make certain that the water hose will not come in
contact with the blade or interfere with any moving
parts. The best location for the water pump/strainer
is between the splash shield and the rear of the water
tray. This will prevent some of the abrasive particles
from flowing through the pump.
WARNING
Whenever cleaning, adjusting or lubricating any part
of the saw, MAKE CERTAIN to stop the engine and
disconnect the spark plug wire from the spark plug
WARNING
ALWAYS
position the
strainer
in the water tray in
a manner that will allow the free movement of the
conveyor cart, and clearance from the cutting blade
and cutting action.
NOTICE
The mechanical water pump is shipped from the factory for
wet
cutting
applications.
WET CUTTING (GASOLINE ONLY)
To connect the
mechanical water pump
to the drive V-belts
perform the following:
1. Loosen the 2 hex head cap screws (Figure 16) that
secure the pump mount bracket.
2.
Push
the pump handle
downward
to engage the
pump.
3. Tighten the 2 hex head cap screws that secure the
pump mount bracket.
Figure 14. Pump Engage
Summary of Contents for MP115E
Page 13: ...MP1 SERIES MASONRY SAW OPERATION AND PARTS MANUAL REV 2 10 12 17 PAGE 13 NOTES ...
Page 40: ...PAGE 40 MP1 SERIES MASONRY SAW OPERATION AND PARTS MANUAL REV 2 10 12 17 TRAY ASSY ...
Page 42: ...PAGE 42 MP1 SERIES MASONRY SAW OPERATION AND PARTS MANUAL REV 2 10 12 17 CART ASSY ...
Page 89: ...MP1 SERIES MASONRY SAW OPERATION AND PARTS MANUAL REV 2 10 12 17 PAGE 89 NOTES ...