•
Severe Duty “SD” models only:
•
For Severe Duty models, there is an additional filter vessel that will need to be
installed between the CDR pump outlet, and the CDR inlet manifold. Longer hoses
are provided in the installation kit. The purpose of this vessel is to capture all
particles larger than 1/16
” but allow all the fine particles to flow through and be
removed by the hydro-cyclones. There is a #1 size 1/16
” perforated screen basket
that can be manually emptied, cleaned, and re-used.
•
IMPORTANT
– Be sure to set filter life timer in CDR software to alert operator when
to empty the filter basket. See label on side of CDR electrical panel for instructions
or refer to manual. If timer is not set, or setting is too long, the basket will overfill,
and hoses/pump will clog.
1. Remove the 2
” hose connecting outlet of CDR pump to cyclone inlet manifold.
2. Position filter vessel near front corner of CDR settling tank. See image below.
3. I
nstall 2” hose from CDR pump outlet to filter vessel inlet.
4.
Install 2” hose from filter vessel bottom outlet to CDR cyclone manifold inlet.
5. Make sure all hose clamps are tightened securely using the provided 5/16
” nut
driver.
•
IMPORTANT
– Filter vessel drain valve must be kept CLOSED while running.
CDR Pump Outlet
Filter Vessel Inlet
Filter Vessel Outlet
CDR Manifold Inlet