POST checkpoint codes
6-13
6
53h
The memory size information and the CPU registers are saved. Entering real mode
next.
54h
Shutdown was successful. The CPU is in real mode. Disabling the Gate A20 line,
parity, and the NMI next.
57h
The A20 address line, parity, and the NMI are disabled. Adjusting the memory size
depending on relocation and shadowing next.
58h
The memory size was adjusted for relocation and shadowing. Clearing the Hit
<DEL> message next.
59h
The Hit <DEL> message is cleared. The <WAIT...> message is displayed. Starting
the DMA and interrupt controller test next.
60h
The DMA page register test passed. Performing the DMA Controller 1 base register
test next.
62h
The DMA controller 1 base register test passed. Performing the DMA controller 2
base register test next.
65h
The DMA controller 2 base register test passed. Programming DMA controllers 1
and 2 next.
66h
Completed programming DMA controllers 1 and 2. Initializing the 8259 interrupt
controller next.
7Fh
Extended NMI source enabling is in progress.
80h
The keyboard test has started. Clearing the output buffer and checking for stuck
keys. Issuing the keyboard reset command next.
81h
A keyboard reset error or stuck key was found. Issuing the keyboard controller
interface test command next.
82h
The keyboard controller interface test completed. Writing the command byte and
initializing the circular buffer next.
83h
The command byte was written and global data initialization has completed.
Checking for a locked key next.
84h
Locked key checking is over. Checking for a memory size mismatch with CMOS
RAM data next.
85h
The memory size check is complete. Displaying a soft error and checking for a pass-
word or bypassing WINBIOS Setup next.
Table 6-6. Runtime checkpoint codes (Continued)
Checkpoint
code
Description
Summary of Contents for CPV5000
Page 1: ...CPV5000 CompactPCI Single Board Computer Installation and Reference Guide CPV5000A IH3 ...
Page 16: ...xvi ...
Page 22: ...CPV5000 Single Board Computer Overview 1 6 1 ...
Page 26: ...Getting Started 2 4 2 Figure 2 1 Installing the CPV5000 ...
Page 80: ...Functional Description 4 24 4 ...
Page 108: ...Power On Self Tests 6 18 6 ...
Page 144: ......