![Motor City Wash Works DRY N'SHINE Installation Manual Download Page 47](http://html1.mh-extra.com/html/motor-city-wash-works/dry-nshine/dry-nshine_installation-manual_1838432047.webp)
© Motor City Wash Works, Inc. 48285 Frank, Wixom Michigan 48393 U.S.A.
Phone: 248.313.0272 ▪ Fax: 248. 313.0271
8MANULDNSINS003
03-21-18
www.motorcitywashworks.com
47
Maintenance:
DAILY:
Check for water or air leaks, chaffed hoses electrical cable, etc.
Visually inspect for any sign of wear.
Move the arms manually and duplicate its regular motion and look for abnormalities: A loose fastener may
allow some parts to move or rub and may create a dark “stain” running down the equipment.
Start the day with a “TEST WASH” and check for proper operation.
While you are watching the TEST WASH, check for clogged nozzles. If a nozzle is clogged, remove the
nozzle body and clean the nozzle by inserting a small piece of wire (a small paper clip wire will be fine!) in
the nozzle opening.
Check also for proper coverage of the brushes
Check for the overall performance of the equipment on the vehicle: Profiling, cleaning, etc..
Wash down your equipment and the area around at the end of each day.
MONTHLY:
Each piece of MCWW equipment is assembled with the highest quality bearings and have been factory pre-
lubricated, therefore, they do not require supplemental grease for the first month of operation.
Use any lithium-based NLGI #2 grease (ex: Exxon Mobil MOBILITH AW2).
WARNING
!
OVERLUBRICATION IS A MAJOR CAUSE OF BEARING FAILURES!
LUBRICATE CONSERVATIVELY!
After the first month of operation, grease each bearing (see Picture #82 and 83).
Wash your equipment with a solution made of a mild degreaser and water. Rinse thoroughly.
Perform daily maintenance.
Pic #83 Top Wheel Axle Bearing Pic #84 Top Wheel Arms Bearings
GREASING
POINTS
GREASING
POINTS