
4
5
Sprog
Sprog
Page no.
1.0
Installation of your morsø pellet stove
5
1.1
Before installation
5
1.2
Location, assembly and installation
5
1.3
Stove location/ Offsets
6
1.4
The chimney
7
1.5
Chimney sweep
7
1.6
Example of chimney installations
7
2.0
Stoking technique/ Use of your stove
13
2.1 General
13
2.2
Construction of the pellet stove
13
2.3
Timber (white) pellets
14
2.4
Safety equipment
14
2.5
Operating display and Operating keys
16
2.6
Operation and programming your pellet stove
16
2.7
Functions and operation of your stove
22
3.0
Regular maintenance of the stove
27
3.1 Cleaning
27
3.2
Description of alarms
29
3.3
Information and problems
30
3.4
Guarantee conditions
31
3.5
Liability
32
3.6
Spare parts
33
3.7
Electrical diagram
33
4.0
Technical data
34
Congratulations on the purchase af your new Morsø pellet stove!
Morsø, the largest supplier of the Danish market, has produced
wood-burning stoves of the highest quality since 1853. If you just
follow these instructions, we are sure that you will enjoy and
make good use of your new stove for many years.
Test certificates - must accompany the stove
The Danish Wood Burning Stove Act came into force on 1 January 2008. In connection with the
introduction of the Danish Wood Burning Stove Act there is a requirement for pelleted fuel bur-
ners to be accompanied by a test certificate issued by an accredited testing institution that has
carried out environmental tests on the stove.
The test certificate is enclosed with the stove and must be retained by the owner and ac-
company the stove for its lifetime.
The instalation of your Morsø Pellet stove must be approved by a suitable qualified fitter or lo-
cal building control.
Extra accessories
An extensive range of chimney, floor plates and accessories is available for your Morsø stove,
to ease the day-to-day operation and maintenance of your Morsø stove.
1.0 Installation of your morsø stove
Before installation
Please direct any queries to your Morsø dealer.
•
Prepare the location where the pellet stove is to be installed in accordance with local, na-
tional and European legal requirements.
•
Incorrect installation or poor maintenance (not in accordance with that described in this
guidance) can result in injury or damage to persons or objects. Morsø accepts no civil or
criminal liability in such an event.
•
The chimney system must be connected before the electrical pellet stove is connected to
the power supply.
•
The protection grille fitted inside the pellet hopper must never be removed.
•
There must be sufficient ventilation in the room where the pellet stove is to be installed.
•
The installation, electrical connection,functional check and maintenance must be carried
out by qualified and authorised persons.
Location, assembly and installation
The location of the pellet stove in a habitable room is critical for heating the room uniformly.
Before deciding where to fit the pellet stove, you should take account of the following:
•
Combustion air may not be supplied from a garage or room without ventilation or extrac-
tion, but must be drawn from an open space or from outside.
•
Installation of a pellet stove in a bedroom, bathroom or wet room, or in which another
heater without a separate air supply (fireplace, wood-burning stove, etc.) is already instal-
led, is prohibited.
•
Installation of a stove surroundings with an explosive atmosphere is prohibited.
•
It is beneficial to install the pellet stove in a central location within the room to ensure
maximum circulation of heat.
•
The power supply must be provided with an earth connection (if the cable supplied is not
long enough to reach the socket, an extension cable laid on the floor must used).
•
The pellet stove must be placed where there Is sufficient air supply for pellet combustion
(approx. 50m3/h of air must be available) in accordance with the installation requirements
and the current provisions of the country concerned.
•
The volume of the room may not be below 30 m3.
IMPORTANT!
THE PELLET STOVE MUST BE INSTALLED AND ASSEMBLED BY QUALIFIED PER-
SONS