
Installation Instructions
34
• there is an overload condition (LEDs blinking R/Y - G)
• the load is not connected, not working, or turned off
After all connections have been completed, observe the
LEDs to make sure the controller is operating normally for
system conditions. If the optional digital meter is used,
observe that the display is scrolling with proper voltage
and current values. Also, a self- test can be performed with
digital meter units.
STEP 9:
To
Power-down
WARNING:
Risk of Damage
ONLY disconnect the battery from the ProStar MPPT
AFTER the solar input has been dis-connected. Damage to
the controller may result if the battery is removed while
the ProStar MPPT is charging.
AVERTISSEMENT:
Risque d’endommagement
Le TriStar MPPT 150V SEULEMENT déconnecter la
batterie APRÈS l’entrée solaire a été déconnectée. Le con-
trôleur pourrait endommager si la batterie est retirée quand
le TriStar MPPT 150V est en charge.
• To prevent damage, power-down must be done in the
reverse order as power-up.