Maintenance
C) Checks
Check the following signs of wear
Coulters
These are essential parts of the sowing device
and must imperatively have an aggressive
shape.
“Charge weld” them before excessive wear
Occurs.
Rear guiding plates of the drag arms.
(ref: 213-1234)
Never lubricate or grease these parts
Mount the guiding plates upside down or
change them if they become too thin.
Check the tightness of the following parts:
- After 20 hours of use:
Check the tightness of the main bolts.
2
1
- After 10 hours of use:
Check the tightness of the disc mounting bolts
(disc fastening screws) and the tapered hub
bearings.
If these bearings grow loose they must be
tightened.
-
Remove the bearing’s dust cap.
- Tighten the bolt until the disc’s rotation
becomes difficult.
- Loosen the bolt a quarter of a turn. Always
use loctite
Regularly check the tightness of the wheels
and the tyre pressure.
Tyres:
400/60 - 15.5 = 1.75 Bar
19.0/45 - 17 = 1.5 Bar
10.0/75 - 15.3 = 2.25 Bar
Tyre pressure chart for 19.0/45 - 17 Vredestein Tyres
39
Summary of Contents for UNIDRILL 300
Page 1: ...August 2001...
Page 5: ...4 Safety Regulations...
Page 7: ...6 Warning Symbols 1...
Page 9: ...Safety Instruction Decals 8...
Page 10: ...Safety Instruction Decals 9 25...
Page 29: ...28...
Page 41: ...Maintenance Tyre pressure chart for 10 0 75 15 3 Vredestein Tyres 40...
Page 42: ...Optional Equipment Section 5 MS Flow Modulation 41...
Page 44: ...Starting up 43...
Page 45: ...Starting up 44...
Page 46: ...Operation 45...
Page 47: ...Operation 46...
Page 48: ...Operation 47...
Page 49: ...Operation 48...
Page 50: ...Operation 49...
Page 51: ...50 D E...
Page 55: ...Dragarm Seeding Unit 47 48 54 Parts list...
Page 59: ...Drawbar and Rear Axle Assembly 58 Parts list 47 48 45 1 2 49 3 4 50 51 52 53 53 A B 55 54 35...
Page 61: ...Drive wheel Assembly 60 Parts list 26...
Page 63: ...Seed Box Assembly S900520 S901537 62 Parts list...
Page 65: ...Seed Box Drive Unit 64 Parts list...
Page 67: ...Multiplicator Parts list 66...
Page 69: ...MS Flow Modulation Parts list 1 3 2 7 10 8 9 11 6 5 4 15 14 12 13 68...
Page 71: ...Linak Actuator Tramline Mechanism Parts list 1 5 2 7 6 4 3 9 8 70...
Page 73: ...Seedbox Metering Parts Parts list 10 12 11 8 6 5 4 3 9 2 1 7 72...
Page 75: ...SPI Vertical Lift Marker 74 Parts list...
Page 77: ...Moore Vertical Lift Marker 17 13 16 47 48 Complete disc hub assembly 14 15 74 Parts list...
Page 79: ...Electric Parts Sensors Parts list 1 4 3 2 76...
Page 86: ...Calibration Charts Calibration charts for Rape Barley Peas and Field Beans 83...
Page 87: ...Calibration Charts Calibration charts for Oats Mustard Phacelia and Radish 84...
Page 88: ...Calibration Charts Calibration charts for Lucern Linseed Rye grass and Clover 85...
Page 89: ...Notes 86...