Open the metal power supply box on the camera
enclosure and remove cardboard packing
materials.
REMOVE INSERT
Carefully unpack both boxes and compare
with parts list.
POLE MOUNT CLIPS
POWER
SUPPLY
BOX
PAN
TILT
UNIT
DOME
TRIM
RING
CAMERA
ENCLOSURE
SET-UP PROCEDURE
• See supplied
Model 1001A Installation and Operation Manual
for Class I Purging Set-up.
The use of a temporary SCFH flowmeter is unnecessary. Use the permanently installed flowmeter on the swing
panel in the Purge/Pressurization Unit.
• See supplied
Model 1001A Installation and Operation Manual
for additional installation and operation information.
CONNECTION SIZES, LENGTHS & BENDS
System Supply
Camera Supply
Camera Reference
3/8” OD SS Tubing
SUPPLIED
SUPPLIED
Fully Reamed
3/8” Poly Tubing
1/4” Poly Tubing
MAXIMUM:
100 ft MAX
100 ft MAX
20 ft / 10 bends
GAS SUPPLY
(System Supply)
CAMERA
REFERENCE
CAMERA
SUPPLY
PROTECTED
CAMERA
ENCLOSURE
PEPPERL FUCHS
+
PURGE/PRESSURIZATION UNIT
7
8
9