9
Installation
XG0225 - 170223
Figure 3.d
Clearances for rear vented installation with elbow
Figure 3.f
Fireplace installation, (Rough Frame-In dimensions).
Figure 3.e
Clearances for top or rear vented installation, straight vent run or with elbow(s).
Drywall or
Equiv.
¾"
Plywood
Platform
A
B
C
Venting clearances:
Raised Installation:
Determine the height of the platform based on where you want the
bottom edge of the glass to be, see figure 2 for unit dimensions.
Maintain minimum ceiling height shown in table. Build fireplace frame
as shown in figure 3.f
† C is 29" for straight out the back vent run installations.
REAR VENTED INSTALLATION WITH ELBOW
REAR VENTED INSTALLATION STRAIGHT VENT RUN
Framing Dimensions
Model
A
B
C
R320
55"
47"
23¾" †
R420
67"
47"
23¾" †
R520
77"
45"
23¾" †
R720
101"
46"
23¾" †
R820
113"
46"
23¾" †
Max. Platform
Height
Min. Required
Ceiling Height
24"
8'
48"
10'
Wall framing
34 ¾"
16 ¾"
Wall framing
2" Min.
24" Min.
14" Min.
Summary of Contents for R Series
Page 43: ...43 Notes XG0225 170223 ...