8
Installation
XG0225 - 170223
38 34 "
983
18 14 "
463
PVHFL510-300
Stud Wall
Rear
Fireplace
Floor
Header
Termination
Mounting
Flange
Section 2: Framing
When constructing the framed opening, please ensure there is access
to install the gas line when the unit is installed.
Figure 3.b
Clearances for straight rear vented installation with PVHEX58-300.
Figure 3.c
Clearances for straight rear vented installation with PVHFL510-300.
NOTICE
Clearance Requirements:
Framing clearances:
MODEL
Top - Rear
vent
†
Top - Top
vent
†
Rear
Sides
Floor
Mantel
R320
24"
24"
2"
6"
0"
See Section 6 Finishing around the fireplace
R420
24"
24"
2"
6"
0"
See Section 6 Finishing around the fireplace
R520
24"
24"
2"
6"
0"
See Section 6 Finishing around the fireplace
R720
24"
24"
2"
6"
0"
See Section 6 Finishing around the fireplace
R820
24"
24"
2"
6"
0"
See Section 6 Finishing around the fireplace
NOTES:
†
Clearance from top of fireplace to a combustible ceiling within
the fireplace enclosure. Unprotected combustible walls which are
perpendicular to the fireplace opening must maintain 6" clearance,
see figure 3.
Figure 3.
Combustible Wall Clearances
To ensure the fireplace operates safely, all models must maintain the
following clearances:
STRAIGHT REAR VENTED INSTALLATION - PVHEX510-300
STRAIGHT REAR VENTED INSTALLATION - PVHFL510-300
24"
610
34"
863
8"
203
PVHEX510-300
Stud Wall
Rear
Fireplace
Floor
Header
Termination
Mounting
Flange
34"
38 ¾"
24"
24"
34 ¼"
16 ¼"
8"
18 ¼"
Stud wall rear
Stud wall rear
Termination
mounting
flange
Termination
mounting
flange
PVHEX510-300
PVHFL510-300
Floor
Floor
Fireplace
Fireplace
Header
Header