SERVICE
7. Light pilot and adjust pilot valve.
8. Reinstall venturi cover, heat shield,
insulation and exterior top.
Pilot Assembly Connection
(Figure 18)
Pilot Assembly
(Figure 19)
Main Burners
The connection for the burners is accessed by
removing the venturi cover. The burners are
accessed by removing the grids and carriage.
The burner valves are accessed by removing
the control panel cover.
CAUTION
TURN OFF THE GAS SUPPLY AT THE
MAIN SHUTOFF VALVE THAT IS NEXT TO
THE BROILER BEFORE ATTEMPTING TO
LOOSEN ANY GAS CONNECTIONS.
BURNER ASSEMBLY, ORIFICE, AND
VENTURI
1. Remove the venturi cover as described in
Covers & Panels.
2. Remove the ceramic radiants from each
side of the main burner to be replaced.
3. Loosen the set screw that attaches the
main burner to the venturi assembly.
4. Slide the main burner out of the broiler.
5. If the venturi or orifice is to be replaced,
disconnect the gas line to the venturi.
Remove the gasket. Replace the gasket
every time the venturi or burner is
removed.
6. Loosen the lock nut so that the venturi can
be removed from the orifice bracket.
20
2
3
1
1
Pilot Bracket Assembly
2
Screws
3
Gas Line
Pilot Assembly & Orifice
1
6
2
3
4
5
Summary of Contents for 136W36'
Page 31: ...EXPLODED VIEW 29 C36 C45 ...
Page 33: ...EXPLODED VIEW 31 36W36 43W36 ...