49-80267 Rev. 4
9
Installation Instructions
WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
■ Locate the template packed with the literature.
- Measure 36" from the floor to the top of the
cooking surface. Add hood installation height
determined on page 7. Mark that location.
- Use a level to draw a straight pencil line on the wall.
- Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
■ Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
■ Measure 3-3/4” from the back wall to the centerline
of a 6-1/2” hole on the ceiling.
NOTE:
If drywall is not present, add drywall thickness
to the 3-3/4” dimension.
Wall Ducting:
If ductwork will vent to the rear:
■ Use a level to draw a line straight up from the
centerline on the template.
■ Measure at least 3-3/4” above the top mounting
bracket holes shown on the template to the
centerline of a 6-1/2” dia. duct hole. (Hole may be
elongated for duct elbow.)
HOUSE WIRING LOCATION:
■ The junction box is located on the top left side of
the hood.
■ Wiring should enter the back wall 20” to 26” above
the bottom of the hood, and within 4” of the right
side of the centerline. Wiring should enter at least 4”
above the bracket on the right side.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT:
Framing must be capable of
supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ Install a horizontal support at least 1" x 6" between
two wall studs at the mounting screw location.
The
horizontal support must be flush with the room
side of the studs.
Use cleats behind both sides of
the support to secure to wall studs.
■ Reinstall drywall.
REAR WALL TEMPLATE
CL
49-80271 JR 07-04
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
ALIGN BOTTOM EDGE WITH
PENCIL LINE INDICATING
BOTTOM OF THE HOOD.
5-1/16"
9-5/8"
8-1/8"
2-1/16"
13-3/4"
12-3/4"
Ceiling
3-3/4” c enterline to wall
6-1/2” dia. hole
For ceiling vent ducting
Centerline
3-3/4” min.
above top
mounting
bracket holes
FOR WALL VENT DUCT
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
6” min. opening for ductwork
Centerline of
installation
space
View from rear
cleats
1” x 6” min.
mounting
support
1” = 2.5 cm; 1’ = 0.3 m