Bulk Coin Recycler Technical Manual
TSP157.doc
Issue 1.3
– Jan 11
Money Controls 2008. All rights reserved.
Page 19 of 45
2.19.2 PRODUCT COMPLIANCE
2.19.2.1 Emissions
This product is compliant with EMC test specification EN50081-1; 1992
2.19.2.2 Immunity
This product is compliant with EMC test specification EN50082-1; 1997
2.19.2.3 Safety
This product is compliant with EN60950; 1992 + Amdt A1 & A2: 1993 & A3: 1995 Safety
2.19.3 ENVIRONMENTAL:
Table 4: Environmental Ranges
Operating Temperature
0 to 60
0
C
Storage Temperature
-20 to 70
0
C
Operating Humidity
10 to 75% RH
Storage Humidity
10 to 95% RH non condensing
2.20 Maintenance Schedule
Table 5: Maintenance Schedule
Maintenance Schedule
Every 50,000 to 100,000
depending on coin type.
Using a mild detergent on a damp cloth.
No spray solvents should be used.
Every 500,000 coins.
Replace ejector fingers and spring
Every 1,000,000 coins.
Replace adjuster plate
Expected product lifetime:
3 million coins with routine maintenance
2.20.1 CLEARING A COIN JAM:
Remove all coins from bowl.
Remove motor assembly from base as described.
Clear the jammed coin by either:
i.
Rotating the disk manually, first anti-clockwise then clockwise to free the coin
OR
ii.
Push the coin back in using another coin.
Remove any debris from the disk bed assembly.
Clean the exit window opto with a clean dry cloth.
Re-assemble, as described.
Refill and test the hopper.
Summary of Contents for TSP157
Page 44: ......