HBDV7 Series Direct Vent Gas Fireplace
54D8000
13
VeNtING INFoRMAtIoN
Outside Corner
Inside Corner
Termination Clearances
Termination clearances for buildings with combustible and noncombustible exteriors.
G =
Combustible
6" (152 mm)
Noncombustible
2" (51 mm)
F =
Combustible
6" (152 mm)
Noncombustible
2" (51 mm)
G
Balcony -
with no side wall
M =
Combustible &
Noncombustible
12" (305 mm)
M
Balcony -
with perpendicular side wall
M =
24" (610 mm)
P =
20” (508 mm)
M
F
Alcove Applications*
C
D
C
E
V
V
Combustible &
Noncombustible
V
V
V
E
= Min. 6” (152 mm) for
non-vinyl sidewalls
Min. 12” (305 mm) for
vinyl sidewalls
O
= 8’ (2.4 m) Min.
O
P
584-15
No.
of Caps
D
Min.
C
Max.
1
3’ (914 mm) x D
Actual
6’ (1.8 m)
1 x D
Actual
3
9’ (.7 m)
/3 x D
Actual
4
1’ (3.7 m) 1/ x D
Actual
D
Min.
= # of Termination caps x 3
C
Max.
= ( / # termination caps) x D
Actual
*Note:
Termination in an alcove space (spaces open only on one side and with an overhang) is permitted with the dimensions specified for vinyl or
non-vinyl siding and soffits. 1. There must be a 3’ (914 mm) minimum between termination caps. . All mechanical air intakes within 10’ (1 m) of a
termination cap must be a minimum of 3’ (914 mm) below the termination cap. 3. All gravity air intakes within 3’ (914 mm) of a termination cap must
be a minimum of 1’ (305 mm) below the termination cap.
GeNeRAl INFoRMAtIoN ASSeMBlING VeNt PIPeS
uSA Installations
The venting system must conform to local codes and/or
the current National Fuel Code ANSI Z3.1/NFPA 54.
Only venting components manufactured or approved by
MHSC may be used in Direct Vent systems and UL 1777
Listed Type Flex Venting.
Canadian Installations
The venting system must be installed in accordance with
the current CSA-B149.1 installation code.
Flex Vent Pipes
Secure flex vent pipe in place with a hose clamp (pro-
vided).
*Be sure the flex pipe overlaps at least 1” (5 mm) onto
the collars of the fireplace and termination. If the termi-
nation has an internal bead, be sure to overlap and se-
cure 1” (5 mm) past the bead.
* Be sure the vent is actually crushed before proceeding.
Apply a tug to be sure the vent will not slip off the collars.
Repeat process with 7” flex vent pipe. The same proce-
dure must be performed on the vent side.
FP2585
flex vent
Hose Clamp
FP585
Figure 13 -
Secure flex Pipe with Hose Clamps
Figure 12 -
Termination Clearances