43D0121
9
�
��
�
�
�
�
�
���
�
��� �������
�
��
�
��
���
��
�
�
���
�
���
�
��
�
�
�
�
�
��
�
�
�
�
�
���
�
��� �������
�
���
�
���
�
��
�
�
�
�
�
��
�
��
���
��
Construct fi rebox framing following
Figures 8 through 14 on pages 9 and
10
and the chart to the right and on page 10 for your specifi c installation
requirements.
Refer to Figure 1 on Page 5
for fi rebox dimensions. The
framing headers may rest on the top of the fi rebox standoffs.
The fi rebox may be installed directly on a combustible fl oor or raised on
a platform of an appropriate height. Do not place fi rebox on carpeting,
vinyl, or other soft fl oor coverings. It may, however, be placed on a fl at
wood, plywood, particle board, or other hard surfaces. Be sure fi rebox rests on a solid continuous fl oor or platform with
appropriate framing for support so that no cold air can enter room from under the fi rebox.
Note: Make sure a minimum 19" is between the studs (A).
GPF36
GRCF36 & GLCF36
Peninsula
Corner
A
19" minimum
21" minimum
B
22
1
/
2
// "
23
1
/
8
"
C
39"
39"
D
38"
38"
FIREPLACE FRAMING
Figure 8 - Top View of Framing Specifi cations for
Peninsula Units (Model GPF36)
Figure 9 - Top View of Framing
Specifi cations for Corner Units
(Model GRCF36/GLCF36)
Figure 10 - Framing Specifi cations for
Peninsula Units (Model GPF36)
Figure 11 - Framing Specifi cations
for Corner Units
(Model GRCF36/GLCF36)
Two by Four
Two by Two
(Minimum)
Two by Four
Two by Two
(Minimum)
Gas
Connection
Gas
Connection
Summary of Contents for GLCF36
Page 20: ...20 43D0121 ILLUSTRATED PARTS LIST ...
Page 22: ...22 43D0121 NOTES ...
Page 23: ...43D0121 23 NOTES ...