![MOGAS ISOLATOR 2.0 Installation, Operation And Maintenance Manual Download Page 18](http://html.mh-extra.com/html/mogas/isolator-2-0/isolator-2-0_installation-operation-and-maintenance-manual_1823357018.webp)
ESI-6149 © Copyright 01/22/2018 MOGAS Industries, Inc.
www.mogas.com
18
INSTALL PACKING RING SET
Note:
Applying a lubricant to packing ring surfaces may ease the installation
process.
Install the rings one at a time (one anti-extrusion ring
09B
first, then two stem packing rings
09A
, then the
final anti-extrusion ring
09B
) using the gland flange
thruster
07B
as a packing tool to stuff each packing
ring all the way down against the previous ring .
CHECK POCKET DEPTH
Before installing the final anti-extrusion ring
09B,
ensure there is enough depth for the anti-extrusion
ring to fit flush in the pocket .
INSTALL FINAL ANTI-EXTRUSION RING
If there is enough depth for the final anti-extrusion ring
to fit flush in the pocket, install the anti-extrusion ring
09B
.
If there is not enough depth for the final anti-extrusion
ring to fit flush in the pocket, the packing rings must
be compressed .
To compress packing rings, temporarily install the
gland flange thruster
07B
over stem
05
, then the
gland flange
07
and gland nuts
15
over gland studs
12
. (If necessary, install gland studs, using anti-seize
compound .) Tighten all nuts
evenly
until there is
enough depth for the final anti-extrusion ring
09B
to
fit flush into the pocket .
Once this is accomplished, remove the gland nuts
15
,
gland flange
07
and gland flange thruster
07B
.
Install the final anti-extrusion ring
09B
.
09B
07B
12
05
07
15
09B
09A
Replace Stem Packing
9
10