![MOGAS ISOLATOR 2.0 Installation, Operation And Maintenance Manual Download Page 16](http://html.mh-extra.com/html/mogas/isolator-2-0/isolator-2-0_installation-operation-and-maintenance-manual_1823357016.webp)
ESI-6149 © Copyright 01/22/2018 MOGAS Industries, Inc.
www.mogas.com
16
REMOVE OPERATOR
If operator is present, remove per instructions
provided by manufacturer, or consult MOGAS for
assistance .
CAUTION!
It is
extremely important
to follow these steps to
ensure maximum valve performance .
THIS WILL AFFECT THE VALVE WARRANTY .
!
Note:
Mark any matching components with a marker, tape, etc., prior to
disassembly, for ease of reassembly.
REMOVE STOP PLATE
Use a flathead screwdriver to pry the retaining ring
28
up and off the stem . Then, slide the stop plate
63
up
and off the stem .
Note:
ISOLATOR 2.0 models 3-inch and larger will not have a retaining ring or
stop plate.
REMOVE GLAND NUTS
Remove the packing gland nuts
15
and spring discs
(live loading)
07C
. Remove flat washers
07D
, if
present .
Note:
ISOLATOR 2.0 models 3-inch and larger will not have flat washers.
REMOVE GLAND FLANGE
Lift upward to remove the packing gland flange
07
.
REMOVE GLAND FLANGE THRUSTER
Lift upward to remove the packing gland flange
thruster
07B
.
28
63
15
07C
07D
07
07B
Replace Stem Packing
1
2
3
4
5