Standard of the installation of the ventilation pipe
Additional of the installation of the ventilation pipe
Additional accessory (angled pipe and straight) that are
needed for this condition is not provided in the package
and can be bought separately.
Attention :
4. The surface between the ventilation pipe and the
hanging wall must be coated with heat-resistant
material or concrete material.
5. Keep away the ventilation pipeline from the material
that is easily burned or windows (at least 1 m).
6. Do not install the ventilation pipe in the air
replacement part or smoke ventilation track.
Valve installation
Valve must be installed with the gas inside the pipe and
water inside the pipe to the former pipe connection, and the
hot water pipe must have valve. After the installation,
checking must be done to make sure that there is no gas and
water leak..
Water pipe installation
Use threaded bolt with the diameter G1/2 to connect
the water valve in and out.
Connect the metal pipe and the seal with the
water inflow pipe and the water heater.
Install the water inflow pipe adjusting faucet to
the water inflow pipe.
So that the water heater operates normally, the
water pressure inflow needed is bigger than the
average water pressure.
If the height of the hot water pipe is higher than
the water heater, then another hot water pipe
needs to be installed with the position lower than
the water heater for the depletion.
Use pipe that is resistant to high pressure for hot water pipe.
Hot water pipe is not too long to prevent the lose of the water temperature.