10
Now with the binding wires still in place cut away the extended support from the
Rudder Pivot
using a
jeweler’s saw and file and sand smooth the saw cuts to match the contour of the
Fuselage
frame
structure as seen in the picture below. These extensions were cast in place to facilitate correct
alignment of the
Fuselage
when building.
Now cut away and remove the binding wires with small snips taking care not to snag the
Stringers
.
Add the rigged turnbuckles to all the
Fuselage
sides, tops and bottoms starting at the rear and up to
Station 3.
The bay between 3 and 2 must be left open to add the
Main Gas Tank
. See picture above
and on the next page