
11
INITIAL ASSEMBLY & INSPECTION
1. Inspect the crate and crate contents to ensure no damage occurred during shipping.
2. Remove components from the crate.
3.
Begin by installing the SHORT H-BASE UPRIGHT to the H-BASE by using 2 x 2” HEX BOLTS, 2 x WASHERS
and 2 x NUTS. The head of the bolts should sit within The head of the bolts should sit within The head
of the bolts should sit within the hexagonal cutouts on the H-BASE UPRIGHTS. Ensure that both pieces
are installed facing the same direction.
© 2 0 2 1 E T E R O S T E C H N O L O G I E S I N C . A L L R I G H T S R E S E R V E D . | M O B I U S T R I M M E R . C O M
Summary of Contents for M9 SORTER
Page 2: ...CONTENTS...
Page 4: ...SAFETY...
Page 8: ...INITIAL SETUP...
Page 12: ...4 Install the TALL H BASE UPRIGHT to the H BASE using the same hardware in the last step...
Page 18: ...OPERATIONS...
Page 27: ...CLEANING MAINTENANCE...