
Technical Installation Guide (4G) v1.9
www.mobileye.com
2
Mobileye 8 Connect
7. 4G Cable Ferrite Installation
22
7.1
Instructions for 4G cable Ferrite installation
22
7.2
Mobileye 8 Connect 4G Connection Scheme
23
8. Installation & Calibration
24
8.1 Back-Cover removal
24
8.2 Communication / Connection phase
25
8.3 System Calibration
26
8.3.1 Login
26
8.3.2 Login
27
8.3.3 Vehicle Selection
29
8.3.4 Connection to SeeQ
30
8.3.5 Vehicle Information
31
8.3.6 Vehicle Information
32
8.3.7 Analog Installation
33
8.3.8 Signal Test
34
8.3.8.1 Signal Test Troubleshooting
35
8.3.9 Calibration
36
8.3.9.1 Step 1 – TAC assembly
36
8.3.9.2 Step 2 – Camera attachment
37
9. GPS attachment
38
9.1 Step 3 – GPS attachment
38
9.2 GPS attachment location allowed areas
39
10.
Step 4 – Measurements
40
11.
Step 5 – Camera angle adjustment
44
11.1 Step 6 – Car hood
45
11.2 Step 7 – Calibration
45
12.
Validation
48
10.1 General
48
10.2 Operation
48
13.
Appendix A – 4G Modem
50
13.1 Modem Status
50