MobileAccess™ 1000/1200
Infrastructure Preparation
UM-1000, Revision 2.2
13
2.4 Horizontal Layout Installation
Horizontal layout installation conventions:
•
Connect a separate optic fiber to every site location, where a site may include
more than one RHU.
•
The connection may be to a splice box or directly to the RHU (depending on
the site configuration).
The following figure shows a horizontal layout installation with three RHUs
connected to a number of antennas.
RHU
RHU
CELL
SITE
BU
A
B
C
D
E
F
G
I
H
Figure
2-2: Horizontal Layout Installation