80
8 OPERATION EXAMPLE
8.1 Preparing for Operation
System construction
Configure the programmable controller system used in operation examples.
System configuration
Mounting and wiring modules
Operating procedure
1.
Insert an SD memory card into the high speed data logger module.
Page 66 SD memory card insertion/removal method
2.
Mount all the modules to the main base unit, and wire the power supply.
MELSEC iQ-R Module Configuration Manual
3.
Connect the CPU module and the personal computer with the USB cable.
MELSEC iQ-R CPU Module User's Manual (Startup)
4.
Connect the high speed data logger module and the personal computer with the Ethernet cable.
Page 75 Wiring of an Ethernet cable
Activating the system
Operating procedure
1.
Power ON the power supply module.
2.
Write the sequence program (sh081561eng-program_a.gx3) to the CPU module using GX Works3.
3.
Switch the mode of the CPU module to 'RUN'.
(1) Programmable controller system
(2) SD memory card
(3) Ethernet cable
(4) USB cable
(5) Personal computer
(1)
(3)
(5)
(2)
(4)
Summary of Contents for RD81DL96
Page 2: ......
Page 80: ...78 7 INSTALLATION AND UNINSTALLATION 7 2 Uninstallation Procedure MEMO ...
Page 115: ...8 OPERATION EXAMPLE 8 3 Creating Reports from Continuously Logged Data 113 8 MEMO ...
Page 117: ...APPX Appendix 1 External Dimensions 115 A MEMO ...
Page 119: ...I 117 MEMO ...
Page 123: ......