• Do not unpack indoor units until they have been transported to the installation site.
• Use a forklift to transport the units.
• Install anchor bolts (locally procured).
Anchor bolt size
P250, P500, P300-F, P600-F : ø8 (M8 screw)
P750, P900-F : ø10 (M10 screw)
• Be sure to install indoor units on a level surface. Since the center of gravity of the unit is in the middle of
the unit, if the units are tilted they may fall.
Caution when connecting a duct
• Install a canvas duct between the unit and the duct.
• Use non-flammable parts for the duct.
• Provide sufficient heat/sound insulation to ducts and flanges.
• Avoid using ducts made of flexible aluminum or similar lightweight materials. They may vibrate and
produce noise.
1
Installation
72
(3) Installing the Indoor Unit
CAUTION
Properly dispose of packing materials.
• Pallets and the nails on the pallets can pose the risk of injury.
• Plastic bags can pose suffocation and choking hazards: keep out of the reach of children. Tear the
plastics bags before disposing of them.
CAUTION
Exercise caution when transporting units.
• Products weighing 20 kg[45 lbs] or more should not be carried by one person.
• Do not carry the product by the PP bands that are used on some packages.
• To reduce the risk of cuts, keep your hands away from the heat exchanger fins.
• When using a crane or other hoisting equipment to lift a unit, always suspend the unit from four corners.
WARNING
Install the unit on a level surface.
• If the unit is installed on an incline, water leakage or malfunctions may result. Check for straightness
with a level.
WARNING
Do not stand on the unit.
• You may fall down or the item may fall, causing injury.
Summary of Contents for PUHY-P-YSJM-A
Page 1: ...DATA BOOK AIR CONDITIONING SYSTEMS MODEL PUHY P Y S JM A PFAV P VM E F ...
Page 2: ......
Page 97: ...94 3 Emergency Operation Mode a a a b c d a c ...
Page 98: ...95 b a a a b a b b b ...
Page 100: ...97 ...
Page 101: ...98 ...
Page 103: ......