51
PCA-RP2.5GA
PCA-RP3GA
161
90
254
680
506
56
1240 (suspension bolt pitch)
140
150
320
80
18
70
6
1290
1214
210
180
81
76
1310
Air outlet
1228
Air intake
85
182
201
241
15
157
(3/8F liquid)
(5/8F gas)
(Drainage)
7
2
Electrical box
70
226
3
2
8
5
1 4
Electrical box
When electrical
box is pulled
down
[ Front view ]
Ceiling
32
179
161
38
3879
42
6~7
525
1235
416
263
171
138
86
131
175
1
46
NOTES:
1. Use M10 or W3/8 screws for anchor bolt.
2. Please be sure when installing the drain-up machine (option parts).
Refrigerant pipe will be only upper drain pipe arrangement.
1
Drainage pipe connection (26mm I.D.)
2
Drainage pipe connection (for the left arrangement)
3
Knock out hole for left drain-piping arrangement
4
Refrigerant-pipe connection (gas pipe side/flared connection)
5
Refrigerant-pipe connection (liquid pipe side/flared connection)
6
Knock out hole for upper drain pipe arrangement
7
Knock out hole for left drain pipe arrangement
8
Knock out hole for wiring arrangement
Unit : mm
OC311--2.qxp 04.5.31 1:04 PM Page 51